Completed 24 Engineers Construction BrigadeContract No.: 609/Project/10.11.2024Synthetic Cup Pig Supply For System Operational Testing (SOT)) of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/15.12.2024Sv-1 And Sv-2 Modification Works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/29.09.2024Two Section Mainline Swabbing, Cleaning and pigging required works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/01.02.2024Pipeline preparation for Pre-commissioning and commissioning including EGP, magnet cleaning, pigging and hydrotest assistance, golden tie-in and other required works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/01.02.2024Pipeline preparation for Pre-commissioning and commissioning including EGP, magnet cleaning, pigging and hydrotest assistance, golden tie-in and other required works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/01.02.2024Pipeline preparation for Pre-commissioning and commissioning including EGP, magnet cleaning, pigging and hydrotest assistance, golden tie-in and other required works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 09/Project/16.07.202424Pipeline preparation for EGP, magnet cleaning, pigging and other required works of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/25.11.2024Supply of swabbing Equipment for CDPL project from Chattogram to Fatullah of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/25.11.2024Swabbing operation and manpower from Chattogram to Fatullah of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 24 Engineers Construction BrigadeContract No.: 609/Project/15.12.202410-inch- line Swabbing from Godnail to Fatullah of Transportation of Oil Through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/09Construction of R.C.C Retaining Wall Along The Bank Of Mirza Khal { (0 + 530 to 0 + 620 )  L/B =  90 M } of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/08-1Construction of R.C.C Retaining Wall Along The Bank Of Mirza Khal { (0+440 to 0+530 )  L/B =  90 M  } of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/06-1Construction of R.C.C Retaining Wall Along The Bank Of Mirza Khal { (0+350 to 0+440 )  R/B =  90 M } of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/07Construction of R.C.C Retaining Wall Along The Bank Of Mirza Khal { (0+350 to 0+440 )  L/B =  90 M ) } of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/RWConstruction of R.C.C Retaining Wall Along The Bank Of Mirza Khal { (0+260 to 0+350 )  R/B =  90 M ) } of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed 34 Engineers Construction BrigadeContract No.: 609/Project/ Water Logging/Mirza Khal/05-1Construction of R.C.C Retaining Wall Along The Bank Of Mirza Khal {(CH- (0+260 to 0+350 ) = 90m (L/B)} of Re-excavation, Renovation and Development of Khals for Mitigation Water Logging Problems in Chittagong City. Bangladesh.
Completed TAURENT PROJECTS LIMITEDContract No.: NRL/TPL/WO/10 Dated: 10.01.2022Pipeline String Preparation of 10.75” OD X 1236 meter plus 6” OD X2472 Meter and associated works for Dauk River HDD Section of Indo Bangla Friendship Pipeline Project.
Completed STEELMARK BUILDINGS LIMITED Contract No.: 609/Project/CDPL dated:25th March 2023Laying & Construction of Steel Pipelines 16” ODX 30 Km for Transportation of Oil through Pipeline from Chattogram to Dhaka (CDPL), Bangladesh for SECTION-VI
Completed Gas Transmission Company LimitedContract No.: 28.14.0000.817.02.008.18
dated: 12th Sep 2018
Construction of Design, Build, Procurement & Supply, Installation, Construction, Testing and Commissioning of 1 (one) 200 MMSCFD Capacity Town Border Station at Mirsharai, Chittagong, 1 (one) 120 MMSCFD capacity Town Border Station at Bizra, Comilla and 1 (one) 800 MMSCFD capacity Metering Station at Bakhrabad, Comilla on Turkey (EPC) basis under Construction of Chittagong-Feni- Bakhrabad Gas Transmission Parallel Pipeline Project.
Completed Gas Transmission Company LimitedContract No.: 28.14.0000.817.02.007.18
dated: 30th April 2018
Pipeline Construction of 36” OD X (435+443+459+420)=1757 meter for HDD of 4 river under Construction of Chittagong-Feni-Bakhrabad Gas Transmission Parallel Pipeline Project. 
Completed Bangladesh Petroleum Corporation Contract No. PD(MOI), BPC:28.03.0000.55.06.001-13/178 dtd 02.07.2014Design, Construction & Erection of 14 (fourteen) nos. Petroleum Oil Storage Tank with Auto Gauging System at Mongla Oil Installation, Bagherhat.
Completed Padma Oil Company Limited Contract No. 142/12B dated 05.08.2012Supply, Installation, Testing and Commissioning of Aviation Fuel (Jet A-1) Hydrant System at Hazrat Shahjalal International Airport, Dhaka, Bangladesh on Turn Key Basis.
Completed Gas Transmission Company LimitedContract no. GTCL/J-B/EPC/Rx-ing/Gr.A/1461, dated 10-
08-2010
Installation of 30” OD High Pressure Natural Gas pipeline by Horizontal Directional Drilling (HDD) Method across the Padma River on Design Procurement, Supply, Installation and commissioning on Turnkey Basis Group-A).
Completed Gas Transmission Company LimitedContract No. GTCL/J-B/PLC/001/Sec-A Date: 20.12.2009Construction of 25.00 Km 762 mm (30”) OD x 1000 psig High Pressure Natural Gas Transmission pipeline from Hatikumrul, Sirajganj to East Bank of Atrai River, Natore under West Bank of Jamuna Bridge-Nalka, Hatikumrul-Ishwardi-Bheramara Gas Transmission Pipeline Project.
Completed Bangladesh Gas Fields Company Limited (BGFCL)Contract No. TF(P) 14/06 dated 28.03.2007Dismantling of an existing bolted tank of capacity 5000 BBL and construction of a new welded condensate storage tank of same capacity at the same place of Titas Gas Field, Location-1, Brahmanbaria, 
Completed M/s Nasir Glass Industries Ltd. Supply, Fabrication, Assembly, Welding, Fitting all attachments such as rubber pads/belt, hooks, turn buckle etc. Painting and Delivery of M.S. Glass Pallet (Stand) to NGIL store at Joina Bazar, Sreepur, Gazipur.
Completed M/s Nasir Glass Industries Ltd. Labour Contractor for Fabrication, Erection, Installation Works at NGIL, Joina Bazar, Sreepur, Gazipur for Coating Plant including Mirror Making, Tempering Plant Including preprocessing equipment, complete in all respect.
Completed Padma Oil Company Ltd. Work Order No. 150/2005A dated 07/02/2005.Construction of 3 X 3000 M. Tons Capacity (Each) Storage Tank at Parbotipur Depot, Dijanpur, 
Completed Padma Oil Company Ltd.  Construction of Aviation Refuelling Facilities at Shah Amanat International Airport, Chittagong, Work Order No. 149/2005A dated 07/02/2005.
Completed M/s Nasir Glass Industries Ltd.  Labour contract for Fabrication, Erection and Installation works at NGIL, Joina Bazar, Sreepur, Gazipur for Ore-Dressing Plant /Processed Sand Storage/Batch Plant/Air Compressors/Main Water Circulation System/Factory Water Supply and Drain incl. for Water Column
Completed M/s Nasir Glass Industries Ltd.  Labour contract for Fabrication & Installation of Diesel Storage Tanks 2 (two) nos. each 60,000 litre capacity at NGIL site, Joina Bazar, Sreepur, Gazipur.
Completed M/s Nasir Glass Industries Ltd.  Labour contract for local transportation, erection & installation (mechanical and electrical works) of Electric Mono Beam Overhung Cranes at NGIL Factory, Joina Bazar, Sreepur, Gazipur.
Completed M/s Nasir Glass Industries Ltd.  Labour contract for Fabrication, Erection and Installation works at NGIL, Joina Bazar, Sreepur, Gazipur. (For Tin Bath/Forming, Annealing Lehr, Cutting & Finishing Line, H2 & N2 Plants)
Completed Titas Gas T&D Company Ltd.Contract No. 94.13/OWN FINANCE/2002-2003/1 dtd. 24.11.2002Engineering, Procurement & Construction of 1 No. 12″ DN API -5L X 56/52 offtake on the 20″ Bakhrabad – Demra pipeline in between Meghna – Gomti Bridge towards Comilla) by Hot Tapping Method on Turn Key Basis. The Work also includes construction of 12″ Dia x 1000 PSIG pipeline from Hot Tapping point upto the inlet valve of TBS against IFB No. 
Completed Bakhrabad Gas Systems Limited (Work Order No. BGSL/OPA/MEGHNAGHAT/OFF- TAKE/579 dtd. 30.9.2001).Engineering, Procurement and Construction of two Nos. 16″ OD API 5LX 56/52 off-takes on 20″ OD BKB-DEMRA pipeline near Meghna Ghat Power Plant (AES) Location by Hot-Tapping method 
Completed Padma Oil Company Ltd.COF7048/715 dtd. 28/10/1996Design Laying and Commissioning of 14″ dia Jet A-1 Aviation Fuel Hydrant System upto International Apron at Zia International Airport, Dhaka, 
Completed Padma Oil Company Ltd.COF7048/166 dtd. 12/04/1998Design Laying and Commissioning of 8″ dia Jet A-1 Aviation Fuel Hydrant Line upto  Domestic  Apron  at Zia International Airport, Dhaka, 
Completed Padma Oil Company Ltd. Modification of Kurmitola Aviation Depot as per Shell Aviation Limited specification
Completed Gas Transmission Company Ltd.Contract- 77.05.86/287 dated 19/05/1999Construction of 16″ dia (350) Gas Pipeline from Baghabari 71MW CMS to Westmont Power Plant CMS Project, 
Completed Gas Transmission Company Ltd.Contract GTC.WZ.04 16″ DN/CGS-PS dtd. 04.02.1999Construction of 16″ dia 1.87Km Gas Pipeline from Baghabari City Gate Station to Power Stations at Baghabari, Sirajganj. 
Completed Gas Transmission Company Ltd.Letter of Acceptance No. GTC.WZ.04(NB)/148 dtd. 20.05.1998Construction of 24″ OD 28.42 Km and 20″ dia 35.37Km 1000 PSIG pipeline from Elenga (Tangail) to Baghabari (Sirajganj) via Nalka including installation of a 100 meter wide Karatua river crossing by open cut method under Gas Supply to Western Zone Project, a project of Gas Transmission Company Ltd. 
Completed Padma Oil Company Ltd. Work Order # ENGG.W.O. 982/96 B dated 24/9/1996Construction of storage tanks, pipeline bowser shed, pump house and installation of equipment at Rail Head POL Depot at Parbatipur under Padma Oil Company Ltd.
Completed Occidental of Bangladesh Limited 5169 date 07.04.1997Design, Entinering, Procurement, Construction, Testing and Commissioning of Jalalabad Offplot Pipeline Facilties Project  of Occidental of Bangladesh Ltd.
Completed Sylhet Gas Fields Limited  Construction of 15000 BBLS capacity Condensate Storage Tank, Pipeline, Jetty and Mooring Facilities and Supply of Plants & Equipment at Ashuganj Multipurpose Project under Sylhet Gas Field Ltd.
Completed Bakhrabad Gas Systems Limited Construction of 20″ dia. 350 psig, 17.45 Km long pipeline from Chittagong Ringmain to Rauzan 210 MW thermal Power Station, Chittagong, Bangladesh under Bakhrabad Gas Systems Ltd.
Completed Bakhrabad Gas Systems Limited Construction of 8″ dia 38 Km natural gas distribution on ring main to Karnapuli Paper Mills, Chittagong including Halda river (720ft) and Ichakali river (680ft) crossing (800 psig). i/c fabrication concrete coating, dredging, installation of pipeline, testing and commissioning under Bakhrabad Gas Systems Ltd. (Int’l tender financed by IDA).
Completed Bakhrabad Gas Systems LimitedContract No. BGSL/40/C/013 Date: July 1982Construction of 20″ dia 5270ft natural gas pipeline crossing of Karnaphuli river at Kalurghat, Chittagong 2200 psig) Turnkey basis under Bakhrabad Gas Systems Ltd.
Completed Titas Gas T&D Company Ltd. Contract No. 94.13/93- 94/25/3/454 date 08.11.1993Construction of 8″ dia 11.58Km natural gas pipeline from Shamoli to Mitford, Titas Gas T&D Company Ltd. 
Completed Titas Gas T&D Company Ltd. Project No. 197, 1983-84 Work Order No. 94.13/197/I/204 Date: 07.03.198414″ dia 12.25Km natural gas transmission pipeline from Narshingdi – Joydevpur Project, Part I (From Narshingdi valve station no. 12 to East Bank of Sitalakhya river at Ghorashal),
Completed Titas Gas T&D Company Ltd.  24″ dia & 12″ dia pipeline re-instatement rehabilitation of river x-ing and maintenance of works of entire Brahmaputra Basin Gas Pipeline (12″ dia 24 Km Elenga to Ashuganj, 24″ dia 126.5 Km, 12″ dia 56 Km, Dhanua to Mymenshing Section) for one year period (Sub-contract under SPIE CAPAG).
Completed SPIE CAPAG S.A. FRANCE Construction of 12″ dia 17 Km (960 psig) High Pressure Gas Transmission Pipeline from Trishal to Mymenshing Block land including valve station under SPIE CAPAG S.A. FRANCE
Completed SPIE CAPAG S.A. FRANCE Construction of 8″ to 2″ dia 8 miles natural gas distribution pipeline from Ibrahim
Cotton Mills to Chittagong University, Chittagong (150 psig) concrete coating, installation of pipeline, testing and commissioning under Bakhrabad Gas Systems Ltd.